
Ketua Tim Kunjungan Kerja Komisi XII DPR RI Bambang Patijaya saat memimpin kunjungan kerja spesifik Komisi XII DPR RI dengan PT. PGN di Batam, Kepulauan Riau.|Foto : Mentari/MRI.
PARLEMENTARIA, Batam — Commission XII of the Indonesian House of Representatives has urged PT Perusahaan Gas Negara (PGN) to reorganize natural gas supply arrangements to meet the needs of industrial zones in Batam, Riau Islands. The move is considered important in light of the gap between the volume of gas industries need and the supply currently available.
The call was made by Bambang Patijaya, head of the Commission XII delegation on a specific working visit, during the commission’s visit to Batam, Riau Islands, on Friday (20/11/2026). At a meeting with stakeholders, gas availability was a key concern given its role in supporting industrial activities, both for power generation and factory operations.
"Today, Commission XII is conducting a specific working visit to Batam, one of the topics being the issue of gas availability, which is an important component of industrial processes, both for power generation and to support industrial activities themselves," Patijaya explained.
He said the main issue was that gas demand remained out of balance with the volume of supply that could be provided.
"So the obstacle is that there is still a gap between the amount needed and the amount that can be supplied," he added.
At the meeting, Commission XII urged PGN to review and reorganize supply volumes so they better match industrial needs. This effort is expected to narrow the supply gap, ensuring that the energy needs of Batam’s industrial zones are met and that industrial operations run optimally. (MRI/um)